Home l History l Tenders & Notices l Technical Features l Salient Features l Ongoing Projects
Fare Chart & Ticket
Frequency of Train Service
Automatic Fare Collection
Method of Construction
Expansion Rules
General Rules
Important Contact Information
Indian Railways
RDSO Lucknow
Click to Enlarge
How would you rate Metro services on overall basis?
Excellent

Good

Poor
Home > Tenders & Notices
Tenders & Notices
 

METRO RAILWAY
METRO BHAVAN
33/1, JAWAHARLAL NEHRU ROAD
KOLKATA - 700 071

   
 
CORRINGENDUM No. 1
   
 
Sub - Issue of Corrigendum to Technical Bid of Open Tender S&T/Works/5-2010 issued on 24.06.2010.
   
  Corrigendum No 1a : -
   
Para No. Existing Description Description to be read as

Part
III
SCC
7 (xvi)

The equipment quoted by the bidder should be GPRS and EDGE ready. Moreover, they should include all the stacks (e.g. automatic train control, track side maintenance etc) of EIRENE and MORANE. The GSM – R system shall seamlessly be upgradable to handle signalling information to TPWS train borne equipment in future to support ETCS level 2 signalling.
The equipment quoted by the bidder should be GPRS and EDGE ready. Moreover, they should include all the stacks (e.g. automatic train control, track side maintenance etc) of EIRENE and MORANE. The GSM – R system shall seamlessly be upgradable to handle signaling information to TPWS train borne equipment in future to support ETCS level 2 signalling or equivalent. The bidder shall submit suitable supporting document that its proposed GSM-R system is installed and successfully supporting ETCS level 2 signalling system or equivalent, anywhere in the world.
   
  Corrigendum No 1b : -
   
Para No. Existing Description Description to be read as

Part
III
SCC 12.3

Performance Guarantee bond (PG) (i.e.5% of the total contract value excluding amount of maintenance schedule ‘C') shall be released on completion of the life span of the system defined (10 years, ref para 7(xv)), to be computed from the date of issue of FAC. No further PG shall be required for AMC.
Performance Guarantee Bond (PG), i.e. 5% of the total contract value excluding amount of maintenance schedule ‘C', shall be released on completion of the life span of ten years of the system, as defined in para 7(xv), in respect of all the sections. No further PG shall be required for AMC.
   
 
Note: All other terms and conditions will remain unchanged.
   
 

 

     

Dy. CSTE/Con
For Chief Sig & Telecom Engg
Metro Railway, Kolkata


History l Tenders & Notices l Technical Features l Salient Features l Ongoing Projects l Fare Chart & Ticket
Frequency of Train Service l Automatic Fare Collection l Method of Construction
Expansion Plan l General Rules l Important Contact Info
Powered by Ontrack Systems Ltd.